subject
Physics, 02.11.2019 04:31 ctomo2004

At a dock, a crane lifts a 2009 kg container 20 m, swings it out over the deck of a freighter, and lowers the container into the hold of the freighter, which is 8 m below the level of the dock. the acceleration of gravity is 9.81 m/s 2 . neglect friction losses. how much work is done by the crane on the container? answer in units of kj

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 17:30
In a heat engine if 1000 j of heat enters the system the piston does 500 j of work, what is the final internal energy of the system if the initial energy was 2000 j ?
Answers: 2
question
Physics, 22.06.2019 02:30
Mass (kg) force (n) 5 25 10 50 15 75 20 100 a student was trying to find the relationship between mass and force. he placed four different masses on a table and pulled them using a spring scale. the table shows the different masses used in the experiment and the force required to pull each mass. the student concluded that more force was required to pull heavier objects. what comment would you make regarding his conclusion? a) no clear relation can be observed between mass and force from the data. b) there is a direct proportion between the mass and force listed in the table. c) gravity should have been taken into account while performing the experiment. d) there is an inverse proportion between the mass and force listed in the table.
Answers: 2
question
Physics, 22.06.2019 05:30
Anybody wanna ? (picture included? )
Answers: 1
question
Physics, 22.06.2019 14:30
Which compound is held together by the electrostatic force between two ions? a. co2 b. cci4 c. h2s d. mgf2
Answers: 1
You know the right answer?
At a dock, a crane lifts a 2009 kg container 20 m, swings it out over the deck of a freighter, and l...
Questions
question
English, 20.10.2019 00:30
Questions on the website: 13722363