You work on a concrete crew starting a construction project. Once the pouring begins, it must continue non-stop until it is completed. Your crew will work an 8-hour shift along with two
other crews. The total project requires 175,000 yards of concrete. Your supervisor estimates
that each crew will pour around 1200 yards per hour. How many consecutive days should you
plan to work on this project?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:50
Given the function f(x) = 3x + 1, evaluate f(a + 1). a. 3a + 1 b. a + 2 c. 3a + 4
Answers: 1
question
Mathematics, 21.06.2019 20:00
Ahiker stands at an unknown elevation before he ascends 2 miles up a mountain to an elevation of 9 miles. find the elevation of the hiker before his ascent.
Answers: 1
question
Mathematics, 21.06.2019 22:30
Which description is represented by a discrete graph? kiley bought a platter for $19 and several matching bowls that were $8 each. what is the total cost before tax? the temperature at 9 a.m. was 83° f and is heating up at an average rate of 6°f per hour. what is the temperature x hours later? juan ate an egg with 78 calories and some cereal with 110 calories per serving for breakfast. what is the total amount of calories he consumed? a bottle contained 2,000 ml of liquid and is being poured out at an average rate of 300 ml per second. how much liquid is left in the bottle after x seconds?
Answers: 3
question
Mathematics, 21.06.2019 23:10
What is the radius of the cone in the diagram? round your answer to the nearest whole number
Answers: 2
You know the right answer?
You work on a concrete crew starting a construction project. Once the pouring begins, it must conti...
Questions
Questions on the website: 13722362