Mathematics, 24.07.2019 03:30 amberpublow7
Seattle’s factory is the company’s newest. it was constructed with sustainable building techniques and materials, so its cost structure has been affected in several ways. the seattle plant uses a mix of solar power (not very reliable with so many clouds), thermal power, and wind. it has an array of batteries, so at the beginning of each production day, there is “free” stored energy that can produce up to 8,000 units. of course, energy is just one factor of the cost of production, but it is significant. the cost function for the seattle factory is given by the following piecewise function. that is, is the cost function, where is the number of units produced. the plant’s maximum capacity is 42,000 units per day. sketch a graph to model seattle’s cost structure over the domain [0, 42000]. be sure to label the axes and any endpoints where the graph breaks. (5 points) ):
Answers: 1
Mathematics, 21.06.2019 18:00
What are the equivalent ratios for 24/2= /3= /5.5=108/ = /15
Answers: 1
Mathematics, 21.06.2019 19:00
15 points! write the slope-intercept form of the equation of the line through the given point with the given slope. use y-y = m(x-x) to solve. through (2,5) slope= undefined
Answers: 2
Mathematics, 21.06.2019 21:30
Is triangle jkl congruent to triangle rst? if so, what is the scale factor?
Answers: 1
Seattle’s factory is the company’s newest. it was constructed with sustainable building techniques a...
Health, 25.08.2019 02:30
Computers and Technology, 25.08.2019 02:30
English, 25.08.2019 02:30
Chemistry, 25.08.2019 02:30
Biology, 25.08.2019 02:30
Mathematics, 25.08.2019 02:30
Social Studies, 25.08.2019 02:30
Mathematics, 25.08.2019 02:30
Physics, 25.08.2019 02:30
Mathematics, 25.08.2019 02:30