subject
Mathematics, 03.09.2021 19:20 theresamarieuehling2

A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company manufactures the shafts and frames but purchases the ball bearings from a ball bearing manufacturer. Each shaft must be processed on a forging machine, a lathe, and a grinder. These operations require 0.6 hour, 0.3 hour, and 0.4 hours per shaft, respectively. Each frame requires 0.8 hours on a forging machine, 0.1 hours on a drilling machine, 0.3 hours on a milling machine, and 0.5 hours on a grinder. The company has 5 lathes, 10 grinders, 20 forging machines, 3 drillers, and 6 illers. Assume that each machine operates a maximum of 2400 hours per year. Required:
Formulate the problem of finding the maximum number of assembled components that can be produced as a linear program.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
Based on what i know about mean, this doesn't add up.
Answers: 1
question
Mathematics, 21.06.2019 13:20
Given f(x) = 10x + 4 and g(x) = 3x - 8, what is f(x) + g(x) ? - 7x - 4 - 13x + 4 - 7x + 4 - 13x - 4
Answers: 2
question
Mathematics, 21.06.2019 17:30
Which of the following is true for the relation f(x)=2x^2+1
Answers: 3
question
Mathematics, 21.06.2019 20:30
What is the interquartile range of this data set? 2, 5, 9, 11, 18, 30, 42, 48, 55, 73, 81
Answers: 1
You know the right answer?
A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company m...
Questions
question
Mathematics, 29.08.2020 23:01
Questions on the website: 13722367