subject
Mathematics, 20.07.2021 04:10 hartzpeyton136

A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is lost from the bucket at a constant rate of .5lbs/ft. How much work is done in lifting the sand 80ft?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
What could explain what happened when the time was equal to 120 minutes
Answers: 2
question
Mathematics, 21.06.2019 19:00
What is the volume of a cone with a height of 6 cm in the radius of 2 cm
Answers: 1
question
Mathematics, 21.06.2019 22:30
In order to be invited to tutoring or extension activities a students performance 20 point higher or lower than average for the
Answers: 1
question
Mathematics, 21.06.2019 23:30
Answer each of the questions for the following diagram: 1. what type of angles are these? 2. solve for x. what does x equal? 3. what is the measure of the angles?
Answers: 1
You know the right answer?
A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is...
Questions
question
Advanced Placement (AP), 23.10.2019 00:10
question
English, 23.10.2019 00:10
question
Biology, 23.10.2019 00:10
question
English, 23.10.2019 00:10
question
Mathematics, 23.10.2019 00:10
question
Computers and Technology, 23.10.2019 00:10
Questions on the website: 13722361