subject
Mathematics, 28.04.2021 17:40 drandbone92

The cost function for the Seattle factory is given by the following piecewise function. That is in the cost function, where x is the number of units produced. The plants mum capacity is 42,000 units
per day.
0.35 if * < 8,000
0.75 if 8,000 < x < 20,000
0.83 -
(200,000) F 20.000 <<<
Sketch a graph to model Seattle's cost structure over the domain 10.42000). Be sure to label the
axes and any endpoints where the graph breaks. (s points)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
An advertisement is on a flyer that has a thickness of 8.2 × 10-5 meters. each measurement below is the thickness of a stack of flyers. drag each measurement to the correct stack.
Answers: 2
question
Mathematics, 21.06.2019 16:20
Two lines parallel to the same plane are parallel to eachother
Answers: 1
question
Mathematics, 21.06.2019 21:30
Questions 7-8. use the following table to answer. year 2006 2007 2008 2009 2010 2011 2012 2013 cpi 201.6 207.342 215.303 214.537 218.056 224.939 229.594 232.957 7. suppose you bought a house in 2006 for $120,000. use the table above to calculate the 2013 value adjusted for inflation. (round to the nearest whole number) 8. suppose you bought a house in 2013 for $90,000. use the table above to calculate the 2006 value adjusted for inflation. (round to the nearest whole number)
Answers: 3
question
Mathematics, 21.06.2019 23:00
Qrst is a parallelogram. determine the measure of ∠q pls
Answers: 2
You know the right answer?
The cost function for the Seattle factory is given by the following piecewise function. That is in t...
Questions
Questions on the website: 13722363