a samall assembly line for the assembly of power steering pumps needs to be balanced. shown below is the precedence diagram. the cycle time is determined to be 1.5 minutes . how whuld the line be balanced by choosing the assignable task having the longest task time first?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
What is the difference between regular convex and concave polygons
Answers: 1
question
Mathematics, 21.06.2019 17:00
The variable in a relation who’s value depends on the value of the independent variable is called what?
Answers: 1
question
Mathematics, 21.06.2019 19:30
Kyle and elijah are planning a road trip to california. their car travels 3/4 of a mile per min if they did not stop driving, how many miles could kyle and elijah drive in a whole day? ? 1 day = 24 hours. plzzz i will give you 100 points
Answers: 2
question
Mathematics, 21.06.2019 20:20
Complete the input-output table for the linear function y = 3x. complete the input-output table for the linear function y = 3x. a = b = c =
Answers: 2
You know the right answer?
a samall assembly line for the assembly of power steering pumps needs to be balanced. shown below is...