subject
Mathematics, 15.04.2021 23:00 biancaceja755

. The employee performing final assembly of electric generators at Electro can produce generators at the Poisson rate of 10 generators per hour. The generators are then conveyed on a belt to an employee in the inspection department for final testing. The belt can hold a maximum of 7 generators (plus the final assembly department has an area to work on one generator). An electric sensor will automatically stop the conveyor once it is full, preventing the final assembly department from assembling more units until a space becomes available. The time to inspect generators is exponential with a mean of 15 minutes. a) What is the probability that the final assembly department will stop production

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
What is the expression in factored form? 225x^2 - 144 a. 9(5x+4)^2 b. 9(5x-4)^2 c. 9(4x+5)(4x-5) d. 9(5x+4)(5x-4)
Answers: 2
question
Mathematics, 21.06.2019 23:10
Given the median qr and trapezoid mnpo what is the value of x?
Answers: 3
question
Mathematics, 21.06.2019 23:40
Determine the standard form of the equation of the line that passes through (-2,0) and (8,-5)
Answers: 1
question
Mathematics, 22.06.2019 00:30
You eat $0.85 for every cup of hot chocolate you sell. how many cups do you need to sell to earn $55.25
Answers: 2
You know the right answer?
. The employee performing final assembly of electric generators at Electro can produce generators at...
Questions
question
Mathematics, 11.12.2020 07:00
question
Mathematics, 11.12.2020 07:00
question
Arts, 11.12.2020 07:00
Questions on the website: 13722363