Mathematics, 20.02.2021 22:10 rirnj005
If it takes 6 workers to paint a house in 48 hours how will it take 4 workers to paint the same house?
Answers: 2
Mathematics, 20.06.2019 18:02
Anew fountain in the shape of a hexagon will have 6 sides of equal length. on a scale drawing, the coordinates of the vertices of the fountain are: (7.5,5), (11.5,2), (7.5,β1), (2.5,β1), (β1.5,2), and (2.5,5). how long is each side of the fountain?
Answers: 3
Mathematics, 21.06.2019 17:00
If the wwight of a package is multiplied by 7/10 the result is 65.8 find the weight of the package
Answers: 1
Mathematics, 21.06.2019 22:00
Fatima plans to spend at least $15 and at most $20 dollars on sketch pads and pencils. if she buys 2 sketchpads, how many pemcils can she buy while staying in her price range? fatima can buy between and pencils. ? (type whole numbers. use ascending? order.)
Answers: 1
If it takes 6 workers to paint a house in 48 hours how will it take 4 workers to paint the same hous...
Mathematics, 14.07.2019 03:00
History, 14.07.2019 03:00
Social Studies, 14.07.2019 03:00
Mathematics, 14.07.2019 03:00
Mathematics, 14.07.2019 03:00
Mathematics, 14.07.2019 03:00
Mathematics, 14.07.2019 03:00
Mathematics, 14.07.2019 03:00
Physics, 14.07.2019 03:00