subject
Mathematics, 24.04.2020 05:45 toricepeda82

Write .0042 as a multiple of a power of 10

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
The height of a flare fired from the deck of a ship in distress can be modeled by h(t)= -2(8t^2-52t-28), where h is the height of the flare above water and t is the time in seconds. a. find the time it takes the flare to hit the water.
Answers: 1
question
Mathematics, 21.06.2019 23:00
Is there a direction u in which the rate of change of f(x,y)equals=x squared minus 3 xy plus 4 y squaredx2βˆ’3xy+4y2 at p(1,2) equals 14? give reasons for your answer. choose the correct answer below. a. no. the given rate of change is smaller than the minimum rate of change. b. no. the given rate of change is larger than the maximum rate of change. c. yes. the given rate of change is larger than the minimum rate of change and smaller than the maximum rate of change.
Answers: 2
question
Mathematics, 22.06.2019 02:00
If p(x) is the total value of the production when there are x workers in a plant, then the average productivity of the workforce at the plant is a(x) = p(x) x . (a) find a'(x). a'(x) = xp'(x) βˆ’ p(x) x a'(x) = xp'(x) βˆ’ p(x) x2 a'(x) = p'(x) βˆ’ p(x) x a'(x) = xp'(x) βˆ’ p'(x) x2 a'(x) = p'(x) βˆ’ xp(x) x2 why does the company want to hire more workers if a'(x) > 0? a'(x) > 0 β‡’ a(x) is ; that is, the average productivity as the size of the workforce increases. (b) if p'(x) is greater than the average productivity, which of the following must be true? p'(x) βˆ’ xp(x) > 0 p'(x) βˆ’ xp(x) < 0 xp'(x) βˆ’ p'(x) > 0 xp'(x) βˆ’ p(x) < 0 xp'(x) βˆ’ p(x) > 0
Answers: 2
question
Mathematics, 22.06.2019 05:20
Say that a supplier claims they are 99% confident that their products will be in the interval of 50.02 to 50.38. you take samples and find that the 99% confidence interval of what they are sending is 50.00 to 50.36. what conclusion can be made? homework : 5vd. comparing sample confidence intervals with given intervals (links to an external site.)links to an external site. (3: 43) 5dc. confidence intervals in manufacturing, high vs low level of confidence, wide vs narrow (links to an external site.)links to an external site. (docx) the supplier is less accurate than they claimed the supplier products have a lower mean than claimed the supplier is more accurate than they claimed the supplier products have a higher mean than claimed
Answers: 2
You know the right answer?
Write .0042 as a multiple of a power of 10...
Questions
question
Mathematics, 18.10.2019 23:00
question
Biology, 18.10.2019 23:00
Questions on the website: 13722363