Bruce's Material Company hauls gravel to a construction sito, using a small truck and a large truck. The carrying capacity and operating cost per load are given in the accompanying table. Bruce must deliver a
minimum of 280 cubic yards per day to satisfy his contract with the builder. The union contract with his drivers requires that the total number of loads per day is a minimum of 10. How many loads should be
made in each truck per day to minimize the total cost?
Small Truck Large Truck
Capacity (yd) 40
70
Cost per Load
$69 $56
In order to minimize the total cost, the number of loads in a small truck that should be made is
and the number of loads in a large truck that should be made is

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Can someone check if i did this right since i really want to make sure it’s correct. if you do you so much
Answers: 2
question
Mathematics, 21.06.2019 19:20
Based on the diagram, match the trigonometric ratios with the corresponding ratios of the sides of the triangle. tiles : cosb sinb tanb sincposs matches: c/b b/a b/c c/a
Answers: 2
question
Mathematics, 21.06.2019 20:00
What is the total area of the figure?
Answers: 1
question
Mathematics, 21.06.2019 23:30
The perimeter of an equilateral triangle is 4 cm more than the perimeter of a square and the length of a side of the triangle is 8 cm more than the length of a side of the aware. find the length of a side of the equilateral triangle
Answers: 1
You know the right answer?
Bruce's Material Company hauls gravel to a construction sito, using a small truck and a large truck....
Questions
question
Mathematics, 19.07.2019 20:50
question
Mathematics, 19.07.2019 20:50
question
Mathematics, 19.07.2019 20:50
Questions on the website: 13722367