Mathematics, 29.08.2019 21:30 MrSavannahCat

Asawmill runs for three 4-hour shifts per day. it produces 500 2x4's per hour, which are divided into 50 piece bundles automatically. if a forklift operator is able to load 10 bundles of 2x4's per hour, how many hours will it take the operator to load a full day of production?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Awall map has a scale of 128 miles = 6 inches. the distance between springfield and lakeview is 2 feet on the map. what is the actual distance between springfield and lakeview? 384 miles 512 miles 1.13 miles 42.7 miles
Answers: 1
question
Mathematics, 21.06.2019 16:00
Determine the volume of a cylinder bucket if the diameter is 8.5 in. and the height is 11.5 in.
Answers: 1
question
Mathematics, 21.06.2019 17:00
Which expression is equivalent to 8(k + m) − 15(2k + 5m)?
Answers: 1
question
Mathematics, 21.06.2019 18:00
Plz a. s. a. p.the table shows the number of male and female contestants who did not win a prize. what is the probability that a randomly selected contestant won a prize, given that the contestant was female? write the probability as a percent. round to the neares tenth, if needed.
Answers: 1
You know the right answer?
Asawmill runs for three 4-hour shifts per day. it produces 500 2x4's per hour, which are divided int...
Questions
Questions on the website: 13722366