Five samples of size 4 were taken from a process. a range chart was developed that had lclr = 0 and uclr = 2.50. similarly, an average chart was developed with the average range from the five samples, with lcl = 15.0 and ucl = 22.0. the ranges for each of the five samples were 1.75, 2.22, 2.35, 2.04, and 2.30, respectively. the values of the sample average for each sample were 19.5, 22.3, 17.4, 20.1, and 18.9, respectively. what can you tell management from this analysis?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Every time you drive you will experience a combination of driving conditions and environments.
Answers: 1
question
Mathematics, 21.06.2019 17:00
Ben is three times as old as samantha, who is two years older than half of michel's age. if michel is 12. how old is ben?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Sketch one cycle if the cosine function y=2cos2theta
Answers: 1
question
Mathematics, 21.06.2019 18:30
Ametal rod needs to be 9 feet and 5.5 inches in length. the sections of the poles being used are each 1 foot and 10.5 inches long. how many 1ft 10.5in sections would be needed to complete the 9ft 5.5in metal rod? and how many inches of material will be left?
Answers: 1
You know the right answer?
Five samples of size 4 were taken from a process. a range chart was developed that had lclr = 0 and...
Questions
question
Social Studies, 28.08.2019 19:30
Questions on the website: 13722363