Given the 1-hour unit hydrograph for a particular watershed, determine the peak flow for a 3-hour storm with direct runoff of 3 cm in the first hour, 2 cm in the second hour, and 4 cm in the third hour 1-hour Unit Hydrograph
Time (hr) 0 1 2 3 4 5 6 7 8
Q(m^3/s) 0 2 4 7 5 3 2 1 0

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 19:10
Asteel wire of 2 mm diameter is fixed between two points located 2 m apart. the tensile force in the wire is 250n, if its density of steel is given by 7830 kg/m3 the fundamental frequency of vibration hz? ?
Answers: 3
question
Engineering, 06.07.2019 03:10
Consider a 1.2 meter high and 2 meter wide glass window whose thickness is 6 mm and thermal conductivity is 0.78 w/m °c. the room temperature is maintained at 24 °c, while the outdoor temperature is -5 °c. the convective heat transfer coefficients on the inner and outer surfaces of the window are 10 w/m2 °c and 25 w/m2 °c respectively. (a) draw the thermal resistance network, etermine the steady rate of heat transfer t e glass window (c) determine the temperature of the inner surface of the window
Answers: 3
question
Engineering, 06.07.2019 03:10
List and describe the parts of boxford cnc milling machine with pictures?
Answers: 2
You know the right answer?
Given the 1-hour unit hydrograph for a particular watershed, determine the peak flow for a 3-hour st...
Questions
question
Mathematics, 22.01.2020 23:31
question
Mathematics, 22.01.2020 23:31
question
Social Studies, 22.01.2020 23:31
Questions on the website: 13722363