subject
Engineering, 12.02.2021 01:00 campbellkruger

Estimate the production of a tracked Caterpillar D5H with a straight blade using the production curves and correction table shown in page 19 and page 20 from . Excellent operator skill, loose stockpile material with a density of 2,000 lb/lcy, normal visibility, and 55 min/hr efficiency. The bulldozer will be pushing downhill on a 9% slope. Average distance 200 feet. a. What is the production rate in lcy/hr?
b. What would the production rate be with an average operator?
c. If you have a choice between an average operator making $15/hr and an excellent operator making $19/hr, which would be the cheapest alternative? Explain your answer

I put the slides you need


Estimate the production of a tracked Caterpillar D5H with a straight blade using the production cur
Estimate the production of a tracked Caterpillar D5H with a straight blade using the production cur

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Hydraulic fluid with a sg. of 0.78 is flowing through a 1.5 in. i.d. pipe at 58 gal/min. the fluid has an absolute viscosity of 11.8 x 105 lbf-sec/ft2. is the flow laminar, turbulent or within the critical range? give both a numerical reynolds number and a term answer.
Answers: 3
question
Engineering, 04.07.2019 19:10
What are the major differences between injection molding and extrusion?
Answers: 2
question
Engineering, 04.07.2019 19:10
When subject to a steady load (within elastic range) over a long period of time, what is the major difference in material behavoir between steel and plastic?
Answers: 2
You know the right answer?
Estimate the production of a tracked Caterpillar D5H with a straight blade using the production curv...
Questions
question
English, 08.10.2019 00:30
Questions on the website: 13722367