subject
Engineering, 02.10.2019 01:00 highspeed7458

The maintenance manager of your facility has asked you to evaluate a particular welding booth that utilizes a local exhaust ventilation (lev) system to remove the contaminant at the source. the exhaust system does not appear to be drawing enough of the welding fumes away from the employees to reduce the iron oxide below the permissible exposure limit (pel) of 10 mg/m3. during your investigation, you determine that the diameter of the duct system is 8 inches and has an air velocity of 350 fpm (feet per minute). the welding operation is performed at a distance of 1.5 feet from the exhaust opening. determine the flow rate, and provide your recommendations on the control measures that could improve the capture of the iron oxide contaminant.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 04.07.2019 19:20
Determine the time of the day and month of the year at which the peak sensible cooling load occurs for a top floor, north-eastern corner room of an office building in durban for the following conditions: floor area: 8 x 8 x 3 m east and north walls: 115 mm face brick (outside), 20 mm air space, 115 mm ordinary brick (inside) with 15 mm plaster roof construction: suspended plasterboard ceiling, 450 mm air space, 150 mm concrete, 75mm screed, waterproofing no heat transfer across other surfaces window area 3x 1,5 m high in north wall only. ordinary glass with venetian blinds. lights and occupants : from 07: 00 to 18: 00 average light density: 25 w/m2 number of occupants : 5 seated, light office work room temperature 24°c
Answers: 3
You know the right answer?
The maintenance manager of your facility has asked you to evaluate a particular welding booth that u...
Questions
question
Chemistry, 19.11.2020 05:40
Questions on the website: 13722360