subject
Business, 22.04.2021 04:40 mirandaperez3412

A machine has velocity ratio 6 and it 70℅ efficiency what effort will be needed to lifting a load 300N with aid of his machine.​

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 16:30
How is the architecture career pathway different from the construction pathway? a. architecture involves coordinating with contractors to make sure everyone stays on schedule. b. architecture involves using tools and equipment to build something new. c. architecture involves the design process, considering the function and safety of the project. d. architecture involves evaluating the work of contractors and employees.
Answers: 1
question
Business, 22.06.2019 06:10
P11.2a (lo 2, 4) fechter corporation had the following stockholders’ equity accounts on january 1, 2020: common stock ($5 par) $500,000, paid-in capital in excess of par—common stock $200,000, and retained earnings $100,000. in 2020, the company had the following treasury stock transactions. journalize and post treasury stock transactions, and prepare stockholders’ equity section. mar. 1 purchased 5,000 shares at $8 per share. june 1 sold 1,000 shares at $12 per share. sept. 1 sold 2,000 shares at $10 per share. dec. 1 sold 1,000 shares at $7 per share. fechter corporation uses the cost method of accounting for treasury stock. in 2020, the company reported net income of $30,000. instructions a. journalize the treasury stock transactions, and prepare the closing entry at december 31, 2020, for net income. b. open accounts for (1) paid-in capital from treasury stock, (2) treasury stock, and (3) retained earnings. (post to t-accounts.) c. prepare the stockholders’ equity section for fechter corporation at december 31, 2020.
Answers: 1
question
Business, 22.06.2019 07:00
Need true or false 1 2 3 4 5 6 7 8
Answers: 1
question
Business, 22.06.2019 10:30
Which maxim is being neglected in the following conversation? eli: how did you do at the track meet? caleb: i came in second place! eli: congratulations! what was your time? caleb: six minutes, four seconds. the guy who won only beat me by three seconds. eli: really? katie said the winning time was under 6 minutes. caleb: oh, well, he might have beat me by five seconds. a)maxim of quantity b)maxim of quality c)maxim of relevance d)maxim of manner
Answers: 1
You know the right answer?
A machine has velocity ratio 6 and it 70℅ efficiency what effort will be needed to lifting a load 30...
Questions
question
Mathematics, 24.08.2019 09:30
Questions on the website: 13722367