Business, 19.03.2021 18:00 Samuelgamboe

Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There has been a long-simmering dispute between the company’s estimator and the work supervisors. The on-site supervisors claim that the estimators do not adequately distinguish between routine work, such as removal of asbestos insulation around heating pipes in older homes, and nonroutine work, such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $2.80 to determine the bid price. Since our average cost is only $2.315 per square foot, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart." To shed light on this controversy, the company initiated an activity-based costing study of all of its costs. Data from the activity-based costing system follow:
Activity Cost Pool Activity Measure Total Activity
Removing asbestos Thousands of square feet 800 thousand square feet
Estimating and job setup Number of jobs 500 jobs
Working on nonroutine jobs Number of nonroutine jobs 100 nonroutine jobs
Other (organization-sustaining costs and idle capacity costs) None
Note: The 100 nonroutine jobs are included in the total of 500 jobs. Both nonroutine jobs and routine jobs require estimating and setup.
Costs for the Year
Wages and salaries $ 360,000
Disposal fees 765,000
Equipment depreciation 98,000
On-site supplies 57,000
Office expenses 270,000
Licensing and insurance 470,000
Total cost $ 2,020,000
Distribution of Resource Consumption Across Activities
Removing Asbestos Estimating and Job Setup Working on Nonroutine Jobs Other Total
Wages and salaries 50 % 10 % 30 % 10 % 100 %
Disposal fees 70 % 0 % 30 % 0 % 100 %
Equipment depreciation 40 % 5 % 20 % 35 % 100 %
On-site supplies 60 % 30 % 10 % 0 % 100 %
Office expenses 15 % 35 % 20 % 30 % 100 %
Licensing and insurance 30 % 0 % 50 % 20 % 100 %
Required:
1. Perform the first-stage allocation of costs to the activity cost pools.
2. Compute the activity rates for the activity cost pools.
3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system.
a. A routine 1,000-square-foot asbestos removal job.
b. A routine 2,000-square-foot asbestos removal job.
c. A nonroutine 2,000-square-foot asbestos removal job.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 01:30
Elliott company produces large quantities of a standardized product. the following information is available for its production activities for march. units costs beginning work in process inventory 2,500 beginning work in process inventory started 25,000 direct materials $ 3,725 ending work in process inventory 5,000 conversion 11,580 $ 15,305 status of ending work in process inventory direct materials added 185,750 materials—percent complete 100 % direct labor added 182,375 conversion—percent complete 30 % overhead applied (140% of direct labor) 255,325 total costs to account for $ 638,755 ending work in process inventory $ 62,530 prepare a process cost summary report for this company, showing costs charged to production, unit cost information, equivalent units of production, cost per eup, and its cost assignment and reconciliation. use the weighted-average method. (round "cost per eup" to 2 decimal places.)
Answers: 1
question
Business, 22.06.2019 10:30
6carla would like to buy a dress, a dresser for her bedroom, and a home theater system. she has one month's worth of living expenses in her emergency fund. carla decides to save for the home theater system. did carla make the right decision? why or why not? a. yes; her emergency fund is full and the other items will probably be less expensive. b. yes; she could save more for her emergency fund, but the home theater will be harder to save for. c. no; she should save more for her emergency fund because she has saved less than the recommended amount. d. no; she should have bought the dress and dresser first because she could afford them right away. reset next
Answers: 2
question
Business, 22.06.2019 13:40
Salge inc. bases its manufacturing overhead budget on budgeted direct labor-hours. the variable overhead rate is $8.10 per direct labor-hour. the company's budgeted fixed manufacturing overhead is $74,730 per month, which includes depreciation of $20,670. all other fixed manufacturing overhead costs represent current cash flows. the direct labor budget indicates that 5,300 direct labor-hours will be required in september. the company recomputes its predetermined overhead rate every month. the predetermined overhead rate for september should be:
Answers: 3
question
Business, 22.06.2019 20:20
John has served as the chief operating officer (coo) for business graphics, inc., a publicly owned firm, the past 5 years. which of the following statements about john is correct? both john and the ceo of business graphics must certify to the sec that the firm's financial statements are accurate. as the coo, john will be ranked higher than the ceo but still below the cfo. in john's postition as the coo, it is highly unlikely that he would also be the chairperson of the board of directors. as the coo, john would typically be involved with accounting, finance, and asset purchase decisions.
Answers: 2
You know the right answer?
Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products f...
Questions
question
Mathematics, 02.03.2021 22:40
question
Chemistry, 02.03.2021 22:40
question
Mathematics, 02.03.2021 22:40
question
Mathematics, 02.03.2021 22:40
question
Mathematics, 02.03.2021 22:40
question
Mathematics, 02.03.2021 22:40
Questions on the website: 13722359