subject
Business, 13.01.2021 02:30 chryssiem16

Daniel wants to predict how much time a hike will take based on the distance of the hike. He collected some data on the time (in hours) and distance (in kilometers) of some of his previous hikes. His data is summarized in the following table: Distance (km) 5.005.005, point, 00 8.008.008, point, 00 9.509.509, point, 50 16.0016.0016, point, 00 18.0018.0018, point, 00 Time (hours) 2.002.002, point, 00 2.752.752, point, 75 4.004.004, point, 00 7.257.257, point, 25 8.508.508, point, 50 All of the scatter plots below display the data correctly, but which one of them displays the data best? By convention, a good scatter plot uses a reasonable scale on both axes and puts the explanatory variable on the xxx-axis. Choose 1 Choose 1 (Choice A) A Graph A (Choice B) B Graph B (Choice C) C Graph C (Choice D) D Graph D Graph A provides Distance, in kilometers, from 0 to 20, in increments of 2, on the y-axis versus Time, in hours, from 0 to 10, in increments of 1, on the x-axis. 5 points rise diagonally between (2, 4.5) and (8.5, 18). All values estimated. space, space, space, space Graph B provides Distance, in kilometers, from 0 to 60, in increments of 5, on the y-axis versus Time, in hours, from 0 to 30, in increments of 5, on the x-axis. 5 points rise diagonally between (2, 4.5) and (8.5, 18). All values estimated. Graph C provides Time, in hours, from 0 to 10, in increments of 1, on the y-axis, versus Distance, in kilometers, from 0 to 20, in increments of 2, on the x-axis. 5 points rise diagonally between (4.5, 2) and (18, 8.5). All values estimated. ~~ space, space Graph D provides Time, in hours, from 0 to 30, in increments of 5, on the y-axis, versus Distance, in kilometers, from 0 to 60, in increments of 5, on the x-axis. 5 points rise diagonally between (4.5, 2) and (18, 8.5). All values estimated. I WILL REPORT IF WRONG AND BAND YOU

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 21:30
Problem 2-18 job-order costing for a service company [lo2-1, lo2-2, lo2-3]speedy auto repairs uses a job-order costing system. the company's direct materials consist of replacement parts installed in customer vehicles, and its direct labor consists of the mechanics' hourly wages. speedy's overhead costs include various items, such as the shop manager's salary, depreciation of equipment, utilities, insurance, and magazine subscriptions and refreshments for the waiting room. the company applies all of its overhead costs to jobs based on direct labor-hours. at the beginning of the year, it made the following estimates: direct labor-hours required to support estimated output 10,000fixed overhead cost $ 90,000variable overhead cost per direct labor-hour $ 1.00 required: 1. compute the predetermined overhead rate.2. during the year, mr. wilkes brought in his vehicle to replace his brakes, spark plugs, and tires. the following information was available with respect to his job: direct materials $ 600direct labor cost $ 180direct labor-hours used 2 compute mr. wilkes' total job cost. 3. if speedy establishes its selling prices using a markup percentage of 30% of its total job cost, then how much would it have charged mr. wilkes?
Answers: 1
question
Business, 22.06.2019 06:10
Information on gerken power co., is shown below. assume the company’s tax rate is 40 percent. debt: 9,400 8.4 percent coupon bonds outstanding, $1,000 par value, 21 years to maturity, selling for 100.5 percent of par; the bonds make semiannual payments. common stock: 219,000 shares outstanding, selling for $83.90 per share; beta is 1.24. preferred stock: 12,900 shares of 5.95 percent preferred stock outstanding, currently selling for $97.10 per share. market: 7.2 percent market risk premium and 5 percent risk-free rate. required: calculate the company's wacc. (do not round intermediate calculations and enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.) wacc %
Answers: 2
question
Business, 22.06.2019 19:00
Consider the following information on stocks a, b, c and their returns (in decimals) in each state: state prob. of state a b c boom 20% 0.27 0.22 0.16 good 45% 0.16 0.09 0.07 poor 25% 0.03 0 0.03 bust 10% -0.08 -0.04 -0.02 if your portfolio is invested 25% in a, 40% in b, and 35% in c, what is the standard deviation of the portfolio in percent? answer to two decimals, carry intermediate calcs. to at least four decimals.
Answers: 2
question
Business, 22.06.2019 19:40
An increase in the market price of men's haircuts, from $16 per haircut to $26 per haircut, initially causes a local barbershop to have its employees work overtime to increase the number of daily haircuts provided from 20 to 25. when the $26 market price remains unchanged for several weeks and all other things remain equal as well, the barbershop hires additional employees and provides 40 haircuts per day. what is the short-run price elasticity of supply? nothing (your answer should have two decimal places.) what is the long-run price elasticity of supply? nothing (your answer should have two decimal places.)
Answers: 1
You know the right answer?
Daniel wants to predict how much time a hike will take based on the distance of the hike. He collect...
Questions
question
English, 23.03.2021 01:00
question
Mathematics, 23.03.2021 01:00
question
Mathematics, 23.03.2021 01:00
question
Mathematics, 23.03.2021 01:00
Questions on the website: 13722362