Business, 26.10.2019 02:43 weirdoal567
Which of the following statements is correct? assume that the project being considered has normal cash flows, with one cash outflow at t = 0 followed by a series of positive cash flows.
a) a project's mirr is always greater than its regular irr.
b) a project's mirr is always less than its regular irr.
c) if a project's irr is greater than its wacc, then its mirr will be greater than the irr.
d) to find a project's mirr, we compound cash inflows at the regular irr and then find the discount rate that causes the pv of the terminal value to equal the initial cost.
e) to find a project's mirr, the textbook procedure compounds cash inflows at the wacc and then finds the discount rate that causes the pv of the terminal value to equal the initial cost.
Answers: 2
Business, 22.06.2019 11:20
Money aggregates identify whether each of the following examples belongs in m1 or m2. if an example belongs in both, be sure to check both boxes. example m1 m2 gilberto has a roll of quarters that he just withdrew from the bank to do laundry. lorenzo has $25,000 in a money market account. neha has $8,000 in a two-year certificate of deposit (cd).
Answers: 3
Business, 22.06.2019 21:50
Q3. loral corporation manufactures parts for an aircraft company. it uses a computerized numerical controlled (cnc) machining center to produce a specific part that has a design (nominal) target of 1.275 inches with tolerances of ± 0.020 inch. the cnc process that manufactures these parts has a mean of 1.285 inches and a standard deviation of 0.005 inch. compute the process capability ratio and process capability index, and comment on the overall capability of the process to meet the design specifications.
Answers: 1
Business, 23.06.2019 00:10
Mno corporation uses a job-order costing system with a predetermined overhead rate based on direct labor-hours. the company based its predetermined overhead rate for the current year on the following data: total estimated direct labor-hours 50,000 total estimated fixed manufacturing overhead cost $ 285,000 estimated variable manufacturing overhead per direct labor-hour $ 3.80 recently, job p123 was completed with the following characteristics: total actual direct labor-hours 20 direct materials $ 710 direct labor cost $ 500 the amount of overhead applied to job p123 is closest to:
Answers: 2
Business, 23.06.2019 00:50
Hubert manages a grocery store in a country experiencing a high rate of inflation. to keep up with inflation, he spends a lot of time every day updating the prices, printing new price tags, and sending out newspaper inserts advertising the new prices. his employees regularly deal with customer annoyance over the frequent price changes. this is an example of the of inflation.
Answers: 2
Which of the following statements is correct? assume that the project being considered has normal c...
Mathematics, 20.05.2021 21:40
English, 20.05.2021 21:40
Business, 20.05.2021 21:40
Social Studies, 20.05.2021 21:40
Mathematics, 20.05.2021 21:40
Mathematics, 20.05.2021 21:40
English, 20.05.2021 21:40
History, 20.05.2021 21:40
English, 20.05.2021 21:40