subject
SAT, 09.05.2021 17:40 jamarengle2

The QMX Company has two assembly lines in its Rotterdam plant. Line A produces and average of 335units per day with a standard deviation equal to 11units. Line B produces and
average of 145 units per day with a standard deviation equal to 8units. Based on this information
using the coefficient of variation determine which line is relatively more consistent?

ansver
Answers: 1

Another question on SAT

question
SAT, 25.06.2019 22:30
According to the passage weisers mother could be blamed for
Answers: 1
question
SAT, 26.06.2019 06:00
Scientists observed a rock stratum and discovered some fossils. the image shows the fossils they discovered. what can you interpret from the image? an illustration showing layers rock with fossils embedded in some rock layers1. the dinosaur and the mammoth existed after the trilobites.2. the dinosaur and the armored fish existed before the trilobites.3. the trilobites and the armored fish died before the dinosaur.4. the trilobites and the armored fish were born after the dinosaur.5. the early mammoth is older than the trilobites.
Answers: 1
question
SAT, 26.06.2019 18:30
After studying french for 5 yearscin school, i was shocked to discover when i went to france that i couldn't even get a glass of water without a lot of sign language what is the author main point
Answers: 1
question
SAT, 27.06.2019 09:20
If your not fit to drive you have a responsibility to
Answers: 1
You know the right answer?
The QMX Company has two assembly lines in its Rotterdam plant. Line A produces and average of 335u...
Questions
question
Mathematics, 26.07.2019 20:30
question
Mathematics, 26.07.2019 20:30
question
Social Studies, 26.07.2019 20:30
question
Mathematics, 26.07.2019 20:30
Questions on the website: 13722362