subject
Physics, 13.03.2022 09:20 BigElote

4. What would be the maximum speed, if the haul road were properly maintained with a rolling resistance of 50 pounds per ton

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 01:20
Abanked road comer of radius 146 m is to be constructed. if the comer is designed for vehicles moving with a speed of 20.0 m/s, what should the banking angle be, in units of degrees?
Answers: 3
question
Physics, 22.06.2019 04:30
The pressure increases by 1.0 x 104 n/m^2 for every meter of depth beneath the surface of the ocean. at what depth does the volume of a pyrex (bulk modulus 2.6 x 1010n/m^2) glass cube, 9.8 x 10^−2m on an edge at the ocean's surface, decrease by 7.5 x 10−10m^3? explain the formula beyond this point: p=1.0x10^4, b=2.6x10^10, l=9.8x10^−2, delta v=7.5x10^−10. at some point l needs to be cubed. why p is divided by delta v?
Answers: 2
question
Physics, 22.06.2019 06:30
How much force was applied to an object if was moved 2 meters and the work done on the object was 8 joules? a. 0.25 n b. 4 n c. 6 n d. 16 n
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
4. What would be the maximum speed, if the haul road were properly maintained with a rolling resista...
Questions
question
Mathematics, 16.12.2020 22:20
question
Mathematics, 16.12.2020 22:20
question
Physics, 16.12.2020 22:20
question
Mathematics, 16.12.2020 22:20
question
Chemistry, 16.12.2020 22:20
question
Mathematics, 16.12.2020 22:20
question
Biology, 16.12.2020 22:20
Questions on the website: 13722367