subject
Physics, 01.12.2021 17:40 peno211

Một lò xo có chiều dài tự nhiên là l0. Treo lò xo thẳng đứng rồi móc vào đầu dưới lò xo một vật có khối lượng m1 = 200 g, lò xo dài 11 cm. Thay vật m1 bằng vật m2 = 800 g, lò xo dài 17 cm. Lấy g = 10 m/s2. Tính chiều dài tự nhiên và độ cứng của lò xo?

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 03:30
Will give brainliest! jay rides his 2.0-kg skateboard. he is moving at speed 5.8 m/s when he pushes off the board and continues to move forward in the air at 5.4 m/s. the board now goes forward at 13 m/s.a. determine jay’s mass.b. determine the change in the internal energy of the system during this process.(express your answer to two significant figures and include the appropriate units.)
Answers: 1
question
Physics, 22.06.2019 04:30
In a voltaic cell, electrons flow from the (positive/negative) to the (positive/negative) terminal.
Answers: 1
question
Physics, 22.06.2019 06:40
Determine the change in width a, height b, thickness t when a plate is subjected to the uniform distributed load and is made of material having modulus of elasticity e=230 gpa and poisson's ratio ν=1/3. given : a=400 mm and b= 300 mm also the uniformly distributed load in downward y direction of plate is 2 mn/m and in the positive x direction is 3 mn/m and t=20 mm
Answers: 1
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
You know the right answer?
Một lò xo có chiều dài tự nhiên là l0. Treo lò xo thẳng đứng rồi móc vào đầu dưới lò xo một vật có k...
Questions
question
Mathematics, 06.04.2021 06:40
question
Social Studies, 06.04.2021 06:40
question
Chemistry, 06.04.2021 06:40
question
History, 06.04.2021 06:40
question
Mathematics, 06.04.2021 06:40
Questions on the website: 13722361