GUYS I NEED HELP THANK U
...
Answers: 3
Physics, 21.06.2019 21:50
Which of the following is a homogenous mixture? o a. a toy box filled with toys o b. blood o c. trail mix o d. spaghetti and meatballs submit
Answers: 2
Physics, 22.06.2019 19:20
Two kilograms of air within a piston–cylinder assembly executes a carnot power cycle with maximum and minimum temperatures of 800 k and 300 k, respectively. the heat transfer to the air during the isothermal expansion is 60 kj. at the end of the isothermal expansion the volume is 0.4 m3. assume the ideal gas model for the air. determine the thermal efficiency, the volume at the beginning of the isothermal expansion, in m3, and the work during the adiabatic expansion, in kj.
Answers: 1
Physics, 22.06.2019 20:40
Ablock of mass m = 2.5 kg is attached to a spring with spring constant k = 740 n/m. it is initially at rest on an inclined plane that is at an angle of theta= 26 with respect to the horizontal, and the coefficient of kinetic friction between the block and the plane is uk = 0.17. in the initial position, where the spring is compressed by a distance of d = 0.16 m, the mass is at its lowest position and the spring is compressed the maximum amount. take the initial gravitational energy of the block as zero. the block's initial mechanical energy is 9.472 j.b. if the spring pushes the block up the incline, what distance l in meters will the block travel before coming to rest? the spring remains attached to both the block and the fixed wall throughout its motion.
Answers: 3
Physics, 22.06.2019 20:50
The second largest public utility in the nation is the sole provider of electricity in 32 counties of southern florida. to meet the monthly demand for electricity in these counties, which is given by the inverse demand function p = 1,200 – 4q, the utility company has set up two electric generating facilities: q1 kilowatts are produced at facility 1, and q2 kilowatts are produced at facility 2 (so q = q1 + q2). the costs of producing electricity at each facility are given by c1(q1) = 8,000 + 6q12 and c2(q2) = 6,000 + 3q22, respectively. determine the profit-maximizing amounts of electricity to produce at the two facilities, the optimal price, and the utility company’s profit
Answers: 3
Biology, 29.06.2019 12:00
Biology, 29.06.2019 12:00
Mathematics, 29.06.2019 12:00
Mathematics, 29.06.2019 12:00
Mathematics, 29.06.2019 12:00
Biology, 29.06.2019 12:00
Chemistry, 29.06.2019 12:00
Mathematics, 29.06.2019 12:00
Mathematics, 29.06.2019 12:00