subject
Physics, 17.05.2021 01:50 cc72501

A worker does 25 J of work lifting a bucket, then sets the bucket back down in the same place. What is the total net work done on the bucket?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 19:50
An object is dropped from a tower, 400 ft above the ground. the object's height above ground t seconds after the fall is s(t)equals400 minus 16 t squared. determine the velocity and acceleration of the object the moment it reaches the ground. the velocity of the object the moment it reaches the ground is nothing ft/s.
Answers: 1
question
Physics, 22.06.2019 10:00
Students design a model roller-coaster track. they place a rubber ball at the highest point on the track and let it go. the ball rolls along the track pulled only by the force of gravity. eventually, it comes to a stop. which change to the design will result in the ball moving the greatest distance?
Answers: 1
question
Physics, 22.06.2019 14:30
A58-kg boy swings a baseball bat, which causes a 0.140-kg baseball to move toward third base with a velocity of 38.0 m/s.
Answers: 2
question
Physics, 22.06.2019 17:00
Using proper grammar, spelling, and punctuation, write at least one 5 sentence paragraph describing 3 ways we use the elements of the electromagnetic spectrum (ems) in our everyday lives.
Answers: 2
You know the right answer?
A worker does 25 J of work lifting a bucket, then sets the bucket back down in the same place. What...
Questions
question
Geography, 31.08.2019 21:30
question
Biology, 31.08.2019 21:30
question
Mathematics, 31.08.2019 21:30
question
English, 31.08.2019 21:30
question
World Languages, 31.08.2019 21:30
Questions on the website: 13722360