subject
Physics, 07.01.2020 22:31 pareshrr

How fast is a wave moving if it has a frequency of 35 hz and there are 6 meters between crest?

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 22:30
The percent efficiency of a machine can never be 100% (or greater), because in the real world some energy is always converted into a. heat b. work c. input force d. output force
Answers: 1
question
Physics, 22.06.2019 00:20
Consider the particle-in-a-box problem in 1d. a particle with mass m is confined to move freely between two hard walls situated at x = 0 and x = l. the potential energy function is given as (a) describe the boundary conditions that must be satisfied by the wavefunctions ψ(x) (such as energy eigenfunctions). (b) solve the schr¨odinger’s equation and by using the boundary conditions of part (a) find all energy eigenfunctions, ψn(x), and the corresponding energies, en. (c) what are the allowed values of the quantum number n above? how did you decide on that? (d) what is the de broglie wavelength for the ground state? (e) sketch a plot of the lowest 3 levels’ wavefunctions (ψn(x) vs x). don’t forget to mark the positions of the walls on the graphs. (f) in a transition between the energy levels above, which transition produces the longest wavelength λ for the emitted photon? what is the corresponding wavele
Answers: 1
question
Physics, 22.06.2019 17:40
The first-order reaction a→2b+c has rate constant 0.538 s−1. if the initial concentration of a is 0.867 mol l−1, what is the half-life of the reaction in seconds? remember to use correct significant figures in your answer (round your answer to the nearest hundredth). do not include units in your response.
Answers: 3
question
Physics, 22.06.2019 20:50
The second largest public utility in the nation is the sole provider of electricity in 32 counties of southern florida. to meet the monthly demand for electricity in these counties, which is given by the inverse demand function p = 1,200 – 4q, the utility company has set up two electric generating facilities: q1 kilowatts are produced at facility 1, and q2 kilowatts are produced at facility 2 (so q = q1 + q2). the costs of producing electricity at each facility are given by c1(q1) = 8,000 + 6q12 and c2(q2) = 6,000 + 3q22, respectively. determine the profit-maximizing amounts of electricity to produce at the two facilities, the optimal price, and the utility company’s profit
Answers: 3
You know the right answer?
How fast is a wave moving if it has a frequency of 35 hz and there are 6 meters between crest?...
Questions
question
Biology, 02.11.2020 15:50
question
Spanish, 02.11.2020 15:50
question
Mathematics, 02.11.2020 15:50
question
History, 02.11.2020 15:50
Questions on the website: 13722367