subject
Physics, 26.10.2019 20:43 KariSupreme

In which scenario is the least amount of work done on a crate?

a) a force of 120 n moves it 25m.
b) a force of 115 n moves it 26m.
c) a force of 130 n move it 22 m.
d) a force of 125 n moves it 27m.

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 05:00
At time t=0, a particle is located at the point (3,6,9). it travels in a straight line to the point (5,2,7), has speed 8 at (3,6,9) and constant acceleration 2i−4j−2k. find an equation for the position vector of the particle.
Answers: 2
question
Physics, 22.06.2019 14:00
Awater balloon launcher uses an elastic band with a spring constant of 115 n/m to use thee launcher you stretch thee band back with a balloon n it the water balloons have a mass of 1.3 kg a) if you stretch the band by 0.8 m, what elastic force will the band exert? b) with the band stretched 0.8 m, how much elastic potential energy is stored in the spring? c) if you release the band, it pushes forward. what is the kinetic energy of the balloon when it reaches the natural length of the band? d) what is the speed of the balloon when it reaches the natural length of the band?
Answers: 1
question
Physics, 22.06.2019 17:00
How can waves travel through ground?
Answers: 1
question
Physics, 22.06.2019 19:30
Which describes increasing the efficiency of energy resource
Answers: 1
You know the right answer?
In which scenario is the least amount of work done on a crate?

a) a force of 120 n mov...
Questions
question
Mathematics, 17.05.2021 07:00
question
Mathematics, 17.05.2021 07:00
question
Biology, 17.05.2021 07:00
question
Business, 17.05.2021 07:00
Questions on the website: 13722367