subject
Physics, 11.03.2021 21:50 officialrogerfp3gf2s

Calculate the work done when a 50 newton object is lifted 5 meters using a pulley.

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 17:20
If you were to drop a rock from a tall building, assuming that it had not yet hit the ground, and neglecting air resistance. what is its vertical displacement (in m) after 6 s?
Answers: 1
question
Physics, 22.06.2019 20:10
Consider two less-than-desirable options. in the first you are driving 30 mph and crash head-on into an identical car also going 30 mph. in the second option you are driving 30 mph and crash head-on into a stationary brick wall. in neither case does your car bounce off the thing it hits, and the collision time is the same in both cases. which of these two situations would result in the greatest impact force?
Answers: 1
question
Physics, 23.06.2019 00:10
Consider a small frictionless puck perched at the top of a fixed sphere of radius r. if the puck is given a tiny nudge so that it begins to slide down, through what vertical height will it descend before it leaves the surface of the sphere? [hint: use conservation of energy to find the puck's speed as a func e conservation of energy to find the puck's speed as a function of its height at what value of this normal force does the puck leave the sphere? ] here on the puck.
Answers: 2
question
Physics, 23.06.2019 01:00
Use vsepr theory to predict the molecular geometry of the molecule hcn.
Answers: 3
You know the right answer?
Calculate the work done when a 50 newton object is lifted 5 meters using a pulley....
Questions
Questions on the website: 13722363