subject
Physics, 25.02.2021 23:30 jakobquittner

A skier of mass 72 kg is pulled up a slope by a motor-driven cable. a. how much work is required to pull him 75 m up a 30 degree slope (assumed frictionless) at a constant speed of 3.4 m/s

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 18:00
Stars x and y are both bluish main sequence stars. star x has a higher absolute brightness than star y. how do the two stars compare? explain
Answers: 1
question
Physics, 22.06.2019 02:30
Iwill give brainliest if you answer right : )
Answers: 3
question
Physics, 22.06.2019 12:30
Consider a 1000 w iron whose base plate is made of 0.5 cm thick aluminum alloy 2024-t6 (ρ = 2770 kg/m3 and cp = 875 j/kg°c). the base plate has a surface area of 0.03 m2. initially, the iron is in thermal equilibrium with the ambient air at 22°c. assuming 90% of the heat generated in the resistance wires is transferred to the plate, determine the minimum time needed for the plate temperature to reach 200°c.
Answers: 1
question
Physics, 22.06.2019 14:30
Aweight lifter raises a 1600 n barbell to a height of 2.0 meters. how much work was done? w = fd a) 30 joules b) 3000 joules c) 320 joules d) 3200 joules
Answers: 2
You know the right answer?
A skier of mass 72 kg is pulled up a slope by a motor-driven cable. a. how much work is required to...
Questions
question
Mathematics, 21.07.2019 22:00
question
Mathematics, 21.07.2019 22:00
question
History, 21.07.2019 22:00
Questions on the website: 13722362