subject
Physics, 13.02.2021 02:30 bicaplinger7766

A front end loader moved a 100 kg pile of dirt from the ground to a ledge 1m above the ground. The machine used 1306 J of energy to perform this task. How efficient is the front end loader?

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 12:40
Question part points submissions used suppose that 2 j of work is needed to stretch a spring from its natural length of 26 cm to a length of 36 cm. (a) how much work is needed to stretch the spring from 28 cm to 32 cm? (round your answer to two decimal places.)
Answers: 2
question
Physics, 22.06.2019 15:10
Auniform crate c with mass mc is being transported to the left by a forklift with a constant speed v1. what is the magnitude of the angular momentum of the crate about point a, that is, the point of contact between the front tire of the forklift and the ground
Answers: 3
question
Physics, 22.06.2019 16:30
The ph is the a.independent variable b.the dependent variable c.control group
Answers: 1
question
Physics, 22.06.2019 17:40
Which describes an object in projectile motion? check all that apply.a.gravity acts to pull the object downb.the object moves in a straight path.c.the forward velocity of the object is 0 m/s.d.the object’s inertia carries it forward.e.the path of the object is curved.
Answers: 2
You know the right answer?
A front end loader moved a 100 kg pile of dirt from the ground to a ledge 1m above the ground. The m...
Questions
question
Physics, 02.07.2021 15:50
Questions on the website: 13722367