Physics, 14.12.2020 20:10 mcmccann4317
The current theory of the structure of the Earth, called tectonic plates, tells us that the continents are in constant motion. Assume that the North American continent can be represented by a slab of rock 4400 km on a side and 35 km deep and that the rock has an average mass density of 2680 kg/m^3. the continent is moving at the rate of about 3 cm/year.
part 1: what is the mass of the continent? answer in units of kg
part 2: what is the kinetic energy of the continent? answer in units of J
part 3: a jogger (of mass 69 kg) has the same kinetic energy as that of the continent, what would his speed be? answer in units of m/s
Answers: 3
Physics, 22.06.2019 03:50
Which statement correctly describes a step-up transformer? a. it increases the amount of electric energy available. b. it increases the voltage of an electric current. c. it changes direct current into alternating current. d. it has more loops of wire in its primary coil.
Answers: 1
Physics, 22.06.2019 07:30
Write the function getkthdigit(n, k) that takes a possibly-negative int n and a non-negative int k, and returns the kth digit of n, starting from 0, counting from the right
Answers: 3
Physics, 22.06.2019 11:50
The scalar triple product computes the magnitude m of the moment of a force vector f about a specified line. it is m = (r × f) · n, where r is the position vector from the line to the point of application of the force and n is a unit vector in the direction of the line. use matlab to compute the magnitude m for the case where f = [12, −5, 4] n, r = [−3, 5, 2] m, and n = [6, 5, −7].
Answers: 3
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
The current theory of the structure of the Earth, called tectonic plates, tells us that the continen...
Mathematics, 04.10.2021 09:50
Mathematics, 04.10.2021 09:50
Spanish, 04.10.2021 09:50
Mathematics, 04.10.2021 09:50
Mathematics, 04.10.2021 09:50
Chemistry, 04.10.2021 09:50
Mathematics, 04.10.2021 09:50
Mathematics, 04.10.2021 09:50
Physics, 04.10.2021 09:50
Engineering, 04.10.2021 09:50
English, 04.10.2021 09:50
Mathematics, 04.10.2021 09:50