subject
Physics, 04.11.2020 01:50 nestergurl101

First answer will be made brainliest Using the graph from part (c) calculate the spring constant of the spring that the student
used.
Give your answer in newtons per metre

the image shows the information that was on the graph


First answer will be made brainliest

Using the graph from part (c) calculate the spring constant

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 16:30
Calculate the kinetic energy of earth due to its spinning about its axis. krot = j compare your answer with the kinetic energy of the orbital motion of earth's center of mass about the sun. assume earth to be a homogeneous sphere of mass 6.00 1024 kg and radius 6.40 106 m. the radius of earth's orbit is 1.50 1011 m.
Answers: 2
question
Physics, 22.06.2019 00:00
Jackson is designing a new heater, and he wants to experiment with different thermally conductive materials. which of these materials would be useful in conducting heat?
Answers: 1
question
Physics, 22.06.2019 04:00
Acompound machine is also called a machine. a. force b. simple c. complex d. directional
Answers: 1
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You know the right answer?
First answer will be made brainliest Using the graph from part (c) calculate the spring constant of...
Questions
question
Mathematics, 19.11.2019 06:31
Questions on the website: 13722362