subject
Physics, 01.09.2020 18:01 acrespo3425

A crane on a building site lifts bricks of total mass 200kg, initially at rest on the ground, with uniform acceleration. When the bricks are 5m from the ground, they have a speed of 5m/s.
How much work is done during this process?
A) 2.5kJ
B) 10kJ
C) 12.5kJ
D) 35kJ

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 15:30
Can you match these to the correct definition
Answers: 3
question
Physics, 22.06.2019 16:30
Place several e-field sensors at a few points on different equipotential lines, and look at the relationship between the electric field and the equipotential lines. which statement is true? 1-at any point, the electric field is perpendicular to the equipotential line at that point, and it is directed toward lines of higher voltages. 2-at any point, the electric field is perpendicular to the equipotential line at that point, and it is directed toward lines of lower voltages. 3-at any point, the electric field is parallel to the equipotential line at that point.
Answers: 1
question
Physics, 22.06.2019 21:00
Identify some abiotic characteristics of the tundra biome.
Answers: 3
question
Physics, 22.06.2019 23:00
Which of the following is another term for a planned economy
Answers: 1
You know the right answer?
A crane on a building site lifts bricks of total mass 200kg, initially at rest on the ground, with u...
Questions
question
History, 19.03.2021 18:30
question
Business, 19.03.2021 18:30
question
Mathematics, 19.03.2021 18:30
question
Mathematics, 19.03.2021 18:30
Questions on the website: 13722367