subject
Physics, 27.06.2020 20:01 kelly1240

4. A worker lifts a 20.0-kg bucket of concrete from the ground up to the top of a 20.0-m tall building. The bucket is initially at rest, but is traveling at 4.0 m/s when it reaches the top of the building. What is the minimum amount of work that the worker did in lifting the bucket

ansver
Answers: 1

Another question on Physics

question
Physics, 21.06.2019 23:20
Acharge of 8.4x10^-4 c moves at an angle of 35 degrees to a magnetic field that has a field strength of 6.7x10^-3 t. if the magnetic force is 3.5 x10 ^-2 n, how fast is the charge moving?
Answers: 1
question
Physics, 22.06.2019 07:10
Polly is pushing a box across the floor with a force of 30 n. the force of gravity is –8 n, and the normal force is 8 n. which value could describe the force of friction if polly could not move the box?
Answers: 2
question
Physics, 22.06.2019 08:00
If a balloon is taken outside on a very cold day, what will occur?
Answers: 1
question
Physics, 22.06.2019 10:00
Suppose a wheel with a tire mounted on it is rotating at the constant rate of 2.15 times a second. a tack is stuck in the tire at a distance of 0.373 m from the rotation axis. noting that for every rotation the tack travels one circumference (a) find the tack's tangential speed. (b) what is the tacks radial acceleration?
Answers: 2
You know the right answer?
4. A worker lifts a 20.0-kg bucket of concrete from the ground up to the top of a 20.0-m tall buildi...
Questions
question
Mathematics, 08.03.2021 19:50
question
Mathematics, 08.03.2021 19:50
question
Geography, 08.03.2021 19:50
Questions on the website: 13722363