subject
Physics, 08.04.2020 16:19 hasshh

A project is located in an area with a demand-response program and on a site that has enough room for a wind-turbine to allow for on-site renewable energy. If the project implements both of these strategies, which of the following will occur?

A. The project's energy costs will decrease B. The project's renewable energy production will decrease C. The project's energy demands will decrease D. the project minimum energy performance will decrease

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 15:30
Which would not reduce the amount of green house gasses in the air
Answers: 1
question
Physics, 21.06.2019 20:30
Ahorizontal wire is tied to supports at each end and vibrates in its second-overtone standing wave. the tension in the wire is 5.00 n, and the node-to-node distance in the standing wave is 6.28 cm. (a) what is the length of the wire? (b) a point at an anti- node of the standing wave on the wire travels from its maximum upward displacement to its maximum downward displacement in 8.40 ms. what is the wire's mass?
Answers: 3
question
Physics, 22.06.2019 07:00
Aball has an initial velocity of 3 m/s. if there is no friction, what is the highest it could roll?
Answers: 1
question
Physics, 22.06.2019 15:00
What property of an object determines its inertia?
Answers: 2
You know the right answer?
A project is located in an area with a demand-response program and on a site that has enough room fo...
Questions
question
Mathematics, 10.12.2020 21:10
question
English, 10.12.2020 21:10
question
Arts, 10.12.2020 21:10
Questions on the website: 13722367