subject
Physics, 23.03.2020 00:54 MayFlowers

A single, nonconstant force acts in the + x ‑direction on an object of mass M that is constrained to move along the x ‑axis. As a result, the object's position as a function of time is x ( t ) = P + Q t + R t 3 How much work W is done by this force from t = 0 s to final time T ? Express the answer in terms of P , Q , R , M , and T .

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 02:30
You are about to open a container of soy milk but notice that there are instructions to “shake well before serving.” the soy milk is most likely a
Answers: 1
question
Physics, 22.06.2019 11:00
1. jay fills a wagon with sand (about 20 kg) and pulls it with a rope 30 m along the beach. he holds the rope 25° above the horizontal. the rope exerts a 20-n tension force on the wagon. how much work does the rope do on the wagon?
Answers: 1
question
Physics, 22.06.2019 14:00
Una carga puntual de 3 x 10-6 c se coloca a 12 cm de una segunda carga puntual de - 1,5 x 10-6 c. calcular la magnitud fuerza eléctrica entre las cargas
Answers: 2
question
Physics, 22.06.2019 20:30
Suppose a force of 60 n is required to stretch and hold a spring 0.1 m from its equilibrium position. a. assuming the spring obeys hooke's law, find the spring constant k. b. how much work is required to compress the spring 0.5 m from its equilibrium position? c. how much work is required to stretch the spring 0.6 m from its equilibrium position? d. how much additional work is required to stretch the spring 0.1 m if it has already been stretched 0.1 m from its equilibrium? a. kequals 600
Answers: 2
You know the right answer?
A single, nonconstant force acts in the + x ‑direction on an object of mass M that is constrained to...
Questions
question
Social Studies, 05.01.2021 16:50
question
Mathematics, 05.01.2021 16:50
question
English, 05.01.2021 16:50
question
Mathematics, 05.01.2021 16:50
question
Spanish, 05.01.2021 16:50
Questions on the website: 13722367