subject
Physics, 19.03.2020 08:02 Emptypockets451

A 10-foot-long chain hangs from the ceiling. It weighs 45 lb. Find the total amount of work done (in ft-lb) when you raise the lower end of the chain up to the ceiling so that it is level with the upper end. Round your answer to two decimal places.

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 19:30
11. you want to calculate the displacement of an object thrown over a bridge. using -10 m/s2 for acceleration due to gravity, what would be the total displacement of the object if it took 8 seconds before hitting the water?
Answers: 1
question
Physics, 21.06.2019 22:00
What is the fate of the electrons that interact with a specimen in an electron microscope?
Answers: 1
question
Physics, 21.06.2019 22:40
Ablock of mass m = 2.5 kg is attached to a spring with spring constant k = 710 n/m. it is initially at rest on an inclined plane that is at an angle of θ = 23° with respect to the horizontal, and the coefficient of kinetic friction between the block and the plane is μk = 0.19. in the initial position, where the spring is compressed by a distance of d = 0.16 m, the mass is at its lowest position and the spring is compressed the maximum amount. take the initial gravitational energy of the block as zero. a) what is the block's initial mechanical energy? b) if the spring pushes the block up the incline, what distance, l, in meters will the block travel before coming to rest? the spring remains attached to both the block and the fixed wall throughout its motion.
Answers: 3
question
Physics, 21.06.2019 23:10
Which are examples of projectile motion? choose all that apply a. a soccer ball rolling across the ground in the northeast direction b. a car turning a corner, so it is heading south c. a javelin flying through the air d. a tennis ball lobbed over the net
Answers: 1
You know the right answer?
A 10-foot-long chain hangs from the ceiling. It weighs 45 lb. Find the total amount of work done (in...
Questions
Questions on the website: 13722363