The average daily demand for component B is 750 units. The average time for waiting during the production process and materials handling is 0.15 days. Processing time per container is 0.1 days. The container capacity is 50 units and the policy variable is 5%. What number of containers is required for component B?

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 05:00
Aperson walking 1 mile everyday for exercise, leaving her front porch at 9: 00 am and returning to her front porch at 9: 25 am. what is the total displacement of her daily walk? a) 1 mileb) 0c) 25 minutes d) none of the above
Answers: 1
question
Physics, 22.06.2019 11:00
Is the time in tennessee the same as florida
Answers: 1
question
Physics, 23.06.2019 01:00
To practice problem-solving strategy 10.1 for energy conservation problems. a sled is being held at rest on a slope that makes an angle θ with the horizontal. after the sled is released, it slides a distance d1 down the slope and then covers the distance d2 along the horizontal terrain before stopping. find the coefficient of kinetic friction μk between the sled and the ground, assuming that it is constant throughout the trip.
Answers: 1
question
Physics, 23.06.2019 04:31
Think you could get me the answers ?
Answers: 1
You know the right answer?
The average daily demand for component B is 750 units. The average time for waiting during the produ...
Questions
question
Mathematics, 24.07.2020 21:01
Questions on the website: 13722363