subject
Physics, 22.02.2020 05:13 kimlyn58p0wyn0

Leaky sandbag A bag of sand originally weighing 144 lb was lifted at a constant rate. As it rose, sand also leaked out at a constant rate. The sand was half gone by the time the bag had been lifted to 18 ft. How much work was done lifting the sand this far? (Neglect the weight of the bag and lifting equipment.)

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 13:40
Consider a double atwood machine constructed as follows: a mass 4m is suspended from a string that passes over a massless pulley on frictionless bearings. the other end of this string supports a second similar pulley, over which passes a second string supporting a mass of 3m at one end and m at the other. using two suitable generalized coordinates, set up the lagrangian and use the lagrange equations to find the acceleration of the mass 4m when the system is released. explain why the top pulley rotates even though it carries equal weights on each side.
Answers: 2
question
Physics, 22.06.2019 15:30
Aforce of 100 newtons is used to move an object a distance of 15 meters with a power of 50 watts. find the work dine and the time it takes to do the work
Answers: 1
question
Physics, 22.06.2019 17:40
Which component of the earth’s atmosphere is decreased due to photosynthesis?
Answers: 1
question
Physics, 22.06.2019 18:00
Sunidhi made a study chart about changes in states of matter. which headings best complete the chart?
Answers: 1
You know the right answer?
Leaky sandbag A bag of sand originally weighing 144 lb was lifted at a constant rate. As it rose, sa...
Questions
question
Physics, 03.05.2020 13:08
question
English, 03.05.2020 13:08
question
Mathematics, 03.05.2020 13:08
Questions on the website: 13722363