subject
Physics, 22.02.2020 03:59 hardwick744

A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to assemble the product is 29.5 min. Production rate of the line is 40 units/hr. The proportion uptime is 96% and the repositioning time is 9 sec. Determine the balance delay on the line

ansver
Answers: 2

Another question on Physics

question
Physics, 22.06.2019 04:30
Light that is polarized along the vertical direction is incident on a sheet of polarizing material. only 96% of the intensity of the light passes through the sheet and strikes a second sheet of polarizing material. no light passes through the second sheet. what angle does the transmission axis of the second sheet make with the vertical?
Answers: 2
question
Physics, 23.06.2019 00:30
Which of the following are forms of phase changes a. freezing b. condensation c. heating d. exchanging
Answers: 2
question
Physics, 23.06.2019 01:30
The flame produced by the burner of a gas (propane) grill is a pale blue color when enough air mixes with the propane (c3h8) to burn it completely. for every gram of propane that flows through the burner, what volume of air is needed to burn it completely? assume that the temperature of the burner is 195.0°c, the pressure is 1.05 atm, and the mole fraction of o2 in air is 0.210.
Answers: 2
question
Physics, 23.06.2019 01:30
Aplane's average speed between two cities is 600 km/h. if the trip takes 2.5 hours, how far does the plane fly?
Answers: 2
You know the right answer?
A manual assembly line has 25 workstations and the manning level is 1.0. The work content time to as...
Questions
question
Mathematics, 30.03.2021 16:10
question
English, 30.03.2021 16:20
question
Mathematics, 30.03.2021 16:20
question
Mathematics, 30.03.2021 16:20
Questions on the website: 13722367