subject
Physics, 21.08.2019 12:30 gabesurlas

If an object of 0.550 kg is lifted from the floor to a height of 3.50m, how much work is done by the lifting force, what is the kinetic energy, and what is the velocity?

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 05:30
Mutt and jeff are running along a path each pushing a cart loaded with rocks. if mutt's wagon has a mass two times greater than jeff's and they want to stay together, arriving at their destination at the same time, what must happen? a) jeff should slow down so mutt can catch up. b) mutt must use half as much force to push his cart. c) mutt must use twice as much force to push his cart. d) mutt and jeff will use the same force, but mutt will take bigger steps.
Answers: 1
question
Physics, 22.06.2019 07:00
We have a colorless transparent liquid. it looks like water. we seperated it into a solid and a liquid by evaporration and condention was this a chemichal or a physical seperation a. chemical seperation b. physical seperation
Answers: 3
question
Physics, 22.06.2019 08:20
The bubba chump shrimp company processes and packages shrimp for sale to wholesale seafood distributors. the shrimp are transported to the main plant by trucks that carry 1,000 pounds (lb) of shrimp. once the continuous flow processing of the shrimp begins, no inventory is allowed in buffers due to spoilage and all of the shrimp must be processed within 12 hours to prevent spoilage. the processing begins at the sorter, where the trucks dump the shrimp onto a conveyor belt that feeds into the sorter, which can sort up to 500 lb per hour. the shrimp then proceed to the desheller, which can process shrimp at the rate of 400 lb per hour. however, after 3 hours and 45 minutes of processing, the desheller must be stopped for 15 minutes to clean out empty shrimp shells that have accumulated. the veins of the shrimp are then removed in the deveining area at a maximum rate of 360 lb per hour. the shrimp proceed to the washing area, where they are processed at 750 lb per hour. finally, the shrimp are packaged and frozen. what is the daily process capacity of the processing plant (excluding the packaging and freezing)?
Answers: 2
question
Physics, 22.06.2019 12:50
Assume you measured the mass of the cart to be (500 ± 1) g and the mass of the additional mass you put on the cart to be (500 ± 1) g as well. since the scale you are using in the lab cannot measure objects heavier than 600g you will have to sum up individual pieces and propagate the error. so what would be the mass and the standard error of the cart and the mass
Answers: 3
You know the right answer?
If an object of 0.550 kg is lifted from the floor to a height of 3.50m, how much work is done by the...
Questions
question
Chemistry, 26.08.2019 03:30
question
History, 26.08.2019 03:30
question
Mathematics, 26.08.2019 03:30
Questions on the website: 13722367