In assigning a value for the most pessimistic (b) duration, the project manager should estimate the duration of the activity to have a 99% likelihood that it will take b or less amount of time.
a) true
b) false

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 16:30
Which of the following would not be taken into consideration when describing the quality of a sound
Answers: 2
question
Physics, 22.06.2019 06:30
Alead ball is dropped into a lake from a diving board 5m above the water . it hits the water with a certain velocity and then sink with constant velocity in bottom . it reaches the bottom 5 second after it is dropped if g= 10m/s2 . find depth of the lake and average velocity of the ball ?
Answers: 1
question
Physics, 22.06.2019 15:00
10 points! will mark brainiest! in a heat engine if 1,000 j of heat enters the system and the piston does 500 j of work, what is the final internal energy of the system if the initial energy was 2,000 j 1: write the equation 2: list out your known variables 3: plug the numbers into the equations 4: solve 5: write your solution statement that includes initial energy and final energy added you so much!
Answers: 3
question
Physics, 22.06.2019 18:30
Which form of cell division creates the sperm and egg, resulting in half of the chromosomes as the other cells?
Answers: 1
You know the right answer?
In assigning a value for the most pessimistic (b) duration, the project manager should estimate the...
Questions
question
Mathematics, 02.08.2019 23:00
Questions on the website: 13722367