subject
Physics, 18.12.2019 04:31 genyjoannerubiera

To get up on the roof, a person (mass 70.0 kg) places a 6.00-m aluminum ladder (mass 10.0 kg) against the house on a concrete pad with the base of the ladder 2.00 m from the house. the ladder rests against a plastic rain gutter, which we can assume to be frictionless. the center of mass of the ladder is 2.00 m from the bottom. the person is standing 3.00 m from the bottom. find the normal reaction and friction forces on the ladder at its base.

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 11:00
Is the time in tennessee the same as florida
Answers: 1
question
Physics, 22.06.2019 11:30
Two 1.20-m nonconducting wires meet at a right angle. one segment carries + 2.50 µc of charge distributed uniformly along its length, and the other carries - 2.50 µc distributed uniformly along it, as shown in fig. 21.50. ( a. find the magnitude and direction of the electric field these wires produce at point p, which is 60.0 cm from each wire. ( b. if an electron is released at p, what are the magnitude and direction of the net force that these wires exert on it?
Answers: 3
question
Physics, 22.06.2019 12:00
Under normal conditions, describe how increasing the temperatures effects the solubility of a typical salt
Answers: 1
question
Physics, 22.06.2019 13:10
1. the materials manager for a billiard ball maker must periodically place orders for resin, one of the raw materials used in producing billiard balls. she knows that manufacturing uses resin at a rate of 50 kilograms each day, and that it costs $.04 per day to carry a kilogram of resin in inventory. she also knows that the order costs for resin are $100 per order, and that the lead time for delivery is four (4) days.2. at what point should resin be reordered? a. 0 kilograms remainingb. 50 kilograms remainingc. 200 kilograms remainingd. 400 kilograms remaininge. 500 kilograms remaining3. if order size was 1,000 kilograms of resin, what would be the length of an order cycle? a. 0.05 daysb. 4 daysc. 16 daysd. 20 dayse. 50 days4. if the order size was 1,000 kilograms of resin, what would be the average inventory level? a. 50 kilogramsb. 200 kilogramsc. 500 kilogramsd. 800 kilogramse. 1,000 kilograms5. if the order size was 1,000 kilograms of resin, what would be the daily total inventory costs, excluding the cost of the resin? a. $5b. $10c. $20d. $25e. $40
Answers: 3
You know the right answer?
To get up on the roof, a person (mass 70.0 kg) places a 6.00-m aluminum ladder (mass 10.0 kg) agains...
Questions
question
Mathematics, 20.04.2021 17:50
question
Mathematics, 20.04.2021 17:50
question
Mathematics, 20.04.2021 17:50
question
Mathematics, 20.04.2021 18:00
Questions on the website: 13722362