subject
Physics, 17.12.2019 02:31 ily50

(10 points) a leaky bucket was pulled from the ground up to 8 meters above the ground at a constant rate of 0.5 meters per second. initially, the bucket contained 25 liters of water. the water was leaking out of the bucket at a constant rate of 0.3 liters per second. assume that both the bucket and the rope have neglible weight. the acceleration due to gravity is 9.8 m/s2 . the density of water is 1 kilogram per liter. find the total amount of work done (in joules) when the bucket of water was moved from the ground to 8 meters above the ground.

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 15:00
Aparticle moves according to a law of motion s = f(t), 0 ≤ t ≤ 12, where t is measured in seconds and s in feet. f(t) = cos(πt/6) (a) find the velocity at time t (in ft/s).
Answers: 3
question
Physics, 22.06.2019 06:30
In positive numbers less than 1, the zeros between the decimal point and a non-zero number are blank significant
Answers: 1
question
Physics, 22.06.2019 12:30
Apositive charge moves in the direction of an electric field. which of the following statements are true? check all that apply. check all that apply. 1.the potential energy associated with the charge decreases. 2. the electric field does positive work on the charge. 3. the electric field does negative work on the charge. 4. the potential energy associated with the charge increases. 5. the electric field does not do any work on the charge. 6. the amount of work done on the charge cannot be determined without additional information.
Answers: 1
question
Physics, 22.06.2019 14:00
Una carga puntual de 3 x 10-6 c se coloca a 12 cm de una segunda carga puntual de - 1,5 x 10-6 c. calcular la magnitud fuerza eléctrica entre las cargas
Answers: 2
You know the right answer?
(10 points) a leaky bucket was pulled from the ground up to 8 meters above the ground at a constant...
Questions
Questions on the website: 13722360