When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time? a. upgrade the equipment b. assign a roaming to support the line c. split the task between two workstations d. speed up the assembly line transfer mechanism e. use a more skilled worker.

ansver
Answers: 3

Another question on Physics

question
Physics, 21.06.2019 21:50
It is may 5 and you are somewhere in the northern hemisphere. if you determine that the noon sun is 51 degrees above your southern horizon, what is the latitude of your location
Answers: 1
question
Physics, 22.06.2019 14:30
Explain what it means to view something from a frame of reference. provide an example that illustrates your explanation. (4 points)
Answers: 1
question
Physics, 22.06.2019 15:10
Auniform crate c with mass mc is being transported to the left by a forklift with a constant speed v1. what is the magnitude of the angular momentum of the crate about point a, that is, the point of contact between the front tire of the forklift and the ground
Answers: 3
question
Physics, 22.06.2019 16:30
Which magnetic property best describes a magnet’s ability to act at a distance? magnets are dipolar. magnets attract only certain objects. magnets have magnetic fields. magnets can transfer their properties to certain materials.
Answers: 1
You know the right answer?
When balancing an assembly line, which of the following is not a way to reduce the longest task time...
Questions
question
Mathematics, 27.09.2020 01:01
question
Mathematics, 27.09.2020 01:01
question
French, 27.09.2020 01:01
question
English, 27.09.2020 01:01
Questions on the website: 13722363