The following data resulted from a study taken on a horizontal milling machine: pieces produced per cycle: 8 average measured cycle time: 8.36 min average measured effort time per cycle: 4.62 min average rapid traverse time: 0.08 min average cutting time power feed: 3.66 min performance rating: 115 percent allowance (machine time): 10 percent allowance (effort time): 15 percent the operator works on the job a full 8-h day and produces 380 pieces. how many standard hours does the operator earn? what is the operator’s efficiency for the 8-h day?

ansver
Answers: 2

Another question on Physics

question
Physics, 21.06.2019 15:00
The functioning of an electron transport chain is analogous to a) a slinky toy going down a flight of stairs. b) a canoe going over a waterfall. c) a person climbing a flight of stairs one step at a time. d) a person leaping from the top to the bottom of a flight of stairs in one jump.
Answers: 2
question
Physics, 22.06.2019 00:00
Name three different units of energy used to measure heat and describe what type of situations each is usually used.
Answers: 2
question
Physics, 22.06.2019 13:00
What effects result when there is an impact between earth and an asteroid? check all that apply. a.massive flooding. b.extinction of many life forms.c.major earthquakes change in average global temperature.d. giant dust cloud
Answers: 3
question
Physics, 22.06.2019 14:40
How does an observation about an object differ from an inference about that object
Answers: 1
You know the right answer?
The following data resulted from a study taken on a horizontal milling machine: pieces produced per...
Questions
question
Physics, 19.05.2021 19:30
question
Mathematics, 19.05.2021 19:30
Questions on the website: 13722363