subject
Physics, 17.10.2019 18:00 tiffanyrhoda

Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill material will be hauled to the site in 21 cy loose measure trucks. the cycle time for a truck is 40 min. per trip. the swell factor for the earth is 25% and the shrinkage factor is 10%. assume 8 hours per day and a 45-min. effective hour. determine the number of required trucks to complete the project in 32 days.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 00:40
The rigid beam is supported by the three suspender bars. bars ab and ef are made of aluminum and bar cd is made of steel. if each bar has a cross-sectional area of 450 mm2, determine the maximum value of p if the allowable stress is (σallow)st = 200 mpa for the steel and ( σallow)al = 150 mpa for the aluminum. est = 200 gpa and eal = 70 gpa.
Answers: 1
question
Physics, 22.06.2019 10:00
Need people build a dam to create a reservoir that supplies water a nearby city needs. describe two ways this action will likely affect the water cycle in the local environment. (5 points) worth 20 points
Answers: 1
question
Physics, 22.06.2019 11:00
I'm thinking it's 2 you are asked to explain the earth's magnetic field. which is the best reply? 1. the earth's magnetic south is similar to the north pole of a magnet. 2. the earth's core has a strong magnetic charge similar to the south pole of a magnet. 3. the earth's geomagnetic south is similar to the south pole of a magnet. 4. the earth's magnetic charge is not centered at either pole; it varies based on location.
Answers: 1
question
Physics, 22.06.2019 14:30
Multiply or divide to make this english distance conversion. 174 inches = feet (14.5, 58, 2,088, 23)
Answers: 2
You know the right answer?
Aproject requires 40,000 cy of compacted fill that must be completed in 32 working days. the fill ma...
Questions
question
Mathematics, 03.12.2021 01:10
question
Mathematics, 03.12.2021 01:10
Questions on the website: 13722361