subject
Physics, 01.10.2019 01:10 lizycacer863

Apositive charge is moved from point a to point b along an equipotential surface. how much work is performed or required in moving the charge?

ansver
Answers: 3

Another question on Physics

question
Physics, 22.06.2019 04:20
Awave is produced in a rope. the wave has a speed of 33 m/s and a frequency of 22 hz.
Answers: 3
question
Physics, 22.06.2019 06:00
Using a pedometer, you walk 3000 steps in 20 minutes, so your speed is 150 steps/min. each of your steps is 0.7 m long. what is your speed? 150 steps/min=/s=/h
Answers: 1
question
Physics, 22.06.2019 12:00
If two students are running down the hall toward each other, trying to get to class, and they have the same mass and acceleration, what will happen when they collide? will their forces cancel out or will each one experience a reaction?
Answers: 1
question
Physics, 22.06.2019 12:10
Ablock having mass m slides down an inclined plane. the force of friction between the block and the inclined plane is f, the block's weight is m g, and the normal force is n. (a) draw a free – body force diagram showing the forces acting on the block. (b) write down all relevant newton’s equations for a given situation.
Answers: 1
You know the right answer?
Apositive charge is moved from point a to point b along an equipotential surface. how much work is p...
Questions
question
Mathematics, 29.06.2021 23:00
question
Mathematics, 29.06.2021 23:00
question
Mathematics, 29.06.2021 23:00
question
Mathematics, 29.06.2021 23:00
question
Mathematics, 29.06.2021 23:00
question
Mathematics, 29.06.2021 23:00
Questions on the website: 13722363