In which of the following scenarios is the greatest amount of work accomplished?
a crane lifts a boulder weighing 300 n to a height of 4.0 meters.
a crane lifts a boulder weighing 400 n to a height of 2.0 meters.
a crane lifts a boulder weighing 200 n to a height of 8.0 meters.
a crane lifts a boulder weighing 250 n to a height of 6.0 meters.

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 07:00
If a tank filled with water contains a block and the height of the water above point a within the block is 0.8 meter, what is the pressure at point a?
Answers: 2
question
Physics, 22.06.2019 07:20
Aman throws a football straight into the air. as it rises, it slows down. which type of energy is the football gaining?
Answers: 2
question
Physics, 22.06.2019 08:00
Which notation is used to represent an alpha particle? a. b. c. d.
Answers: 1
question
Physics, 22.06.2019 11:00
A2.00-m long piano wire with a mass per unit length of 12.0 g/m is under a tension of 8.00 kn. what is the frequency of the fundamental mode of vibration of this wire?
Answers: 3