An operation has a 20 percent scrap rate. as a result, 80 pieces per hour are produced. what is the potential labor productivity that could be achieved by eliminating the scrap?

ansver
Answers: 1

Another question on Physics

question
Physics, 22.06.2019 10:30
Carbon 14 is a naturally occurring stable
Answers: 3
question
Physics, 22.06.2019 18:30
What would people living along the coast in south florida do if there was a hurricane warning? move to locations away from the water flock along coasts to watch the natural phenomenon buy instruments to predict the exact location of the hurricane measure water levels to know the exact time of the hurricane
Answers: 3
question
Physics, 22.06.2019 19:00
The built in flash in a compact camera is usally capable of giving correct exsposure for distance up to how many meters?
Answers: 1
question
Physics, 22.06.2019 22:30
Calculate a pendulums frequency of oscillation (in hz) if the pendulum completes one cycle in 0.5s.
Answers: 1
You know the right answer?
An operation has a 20 percent scrap rate. as a result, 80 pieces per hour are produced. what is the...
Questions
Questions on the website: 13722360